Dirt was relocated from the front yard for the new the driveway. The portion to the lower left was filled and compacted in preparation for the future concrete slab.
Concrete stain crew is starting to stain certain portions of the deck.
A view of the finished stain concrete from above. The new rock patio work can be seen adjoining the stained concrete on the upper right of the photo.